I-39/90/94 Bridges at Highway 60
- County
- Columbia County
- Project Cost
- $19.7 million
- Schedule
- Summer 2022-May 27, 2024
- Contractor
- Integrity Grading & Excavating
This project will replace the interstate bridges on I-39/90/94 at WIS 60, in Columbia County. The existing ramps will be reconfigured into a diamond interchange with roundabouts at the terminals, and WIS 60 will be reconstructed from Sunset Drive to Pine Hollow Road. The project is constructed in 5 main stages and will experience 2 winter shutdown periods. WisDOT Project Page